Itrademarket SMS Listed Since 2008 |
|
 Industrial & Marine Power Services ( IMPS) Indonesia Indonesia |
|
| | |
|
| Products Catalog: Bi Fuel Conversions on Diesel Generators to Operate on 50% Diesel 50% Gas Mixture |
 (Product Photo) |
| Origin: | United Kingdom (Great Britain) |
| Payment Method: | Telegraphic Transfer (T/T) |
| Specification: | We are pleased to put forward our proposal for the conversion example of a typical 1.8MW generator on a mixture of 50%
diesel and 50% gas.
The main advantages of this system are
1. Tremendous Cost Savings ( Example Below)
2. More Environmentally Friendly
3. No Changes To The Engine Are Required
4. Less Carbonisation Of Engine Components Prolonging Service Life
5. Auto Changeover Of Bi-Fuel To Diesel In The Event Of Any Gas Supply Problems
The total cost on this system would be approximately 100, 000 Euros
Our quotation includes the cost of conversion kit, digital diesel flow meters, delivery, installation and commissioning. It does
not include local accommodation for our engineers
Please note that gas Pressure Required at Turbocharger Air Inlet will be 1.5 to 2.5 Barg
Bi-Fuel Purchase Overview
The Bi-fuel gas substitution system for diesel engines works on the principle that the power for your engine can be derived
equally from natural gas as from diesel, by adding the gas into the air naturally taken into the engine. The system does not
involve any direct changes to your engine, merely the addition of the gas mixers in the hose transporting the air from the
filters to the turbochargers.
Purchase:
For the quoted value, we will hook up to the gas supply pipeline from your mains to the engine, deliver all necessary physical
parts, perform the installation, start up and commission three kits on three diesel engine generators.
Payment:
SCOPE OF SUPPLY
1. Three sets of Bi-Fuel System kits
o Gas Train Kits
o Mixer( s) , hardware kit
o Control System Accessory Kit
o Transducers
o Control Systems
o Vibration sensor packages
o Primary Gas Regulators
o Diesel Flow Meters
2. Training
All training necessary for your operators to understand how the system works with your engine will be given. They will be
given instruction on the new control panel and all of the associated controls. We also include as standard basic
troubleshooting of the panel and related devices.
LIMIT OF SUPPLY
The Client has the responsibility to provide the following:
1. Adequate ventilation:
The work area must have a flow through of air sufficient to prevent an accumulation of gas caused by undetected leaks.
2. Combustible Gas Detection:
In case of gas leaks.
3. Approvals:
Any local approvals for altering or adding gas supplies or pipeline. |
Your inquiry will be recorded in "Member Trade Mail". |
Recommend to your friends |
|
|